The Town of Mocksville operates an extensive water system providing service to customers throughout the Town. Water service north of Interstate-40 is provided by the Madison Road Booster Pumping Station which is equipped with two booster pumps, one of which must be operating at all times to maintain system pressure.
In order to improve reliability Willis Engineers identified several improvements to the pump station. The improvements included installation of a smaller pumping unit to reduce wear on the main pumping units. Other improvements included the replacement of the existing control panel, and new flow meters to allow for improved operational control. The project was successfully completed and finished under budget at a cost of approximately $104,000.