Sealed Bids for the construction of Contract 85.0 – Water Treatment Plant No. 1 Renovations were received by the Town of Mooresville on Thursday, October 24, 2024, at which time the Bids received were publicly opened and read. The Project consists of construction of a new 1 MG clearwell, pump station, associated yard piping, new generator, and replacement of existing high service pump control valves, existing filter backwash troughs, and venturi meter and vault.
Apparent Low Bidder: J. Cumby Construction, Inc. – Bid Tab