The Project consists of removing and replacing the existing mechanical and electrical equipment at the Barnes Bridge Road Pump Station. Bids were received on March 22, 2018
Awarded to Charles R. Underwood, Inc. – Bid Tab
Currently under construction
The Project consists of removing and replacing the existing mechanical and electrical equipment at the Barnes Bridge Road Pump Station. Bids were received on March 22, 2018
Awarded to Charles R. Underwood, Inc. – Bid Tab
Currently under construction
The Project consists of removal of the existing hydraulic grinder and installation of mechanical screening equipment, conveyor equipment and all appurtenances. Bids were received on March 6, 2018.
Awarded to Gilbert Engineering – Bid Tab
Currently under construction
The Project consists of installation of approximately 9,200 feet of sewer outfall varying in size from 24-inch to 42-inch from the vicinity of NC Highway 3 along Rocky River to the existing sewer at the Linwood Farms Pumping Station. The work will include decommissioning of the Linwood Farms Pumping Station. Approximately 680 feet of 8-inch sewer will also be installed to allow for decommissioning of the Harris Village Pumping Station.
Bids were received on February 8, 2018
Awarded to BRS, Inc., Richfield, NC – Bid Tab
The Project begins at Catawba Avenue in Cornelius and extends to Concord Avenue in Davidson. These phases of the project will be built simultaneously under one contract and will consist of 76 feet of 2-inch water main, 1,705 feet of 6-inch water main, 24 feet of 8-inch water main, 1,836 feet of 16-inch water main, and 7,541 feet of 24-inch water main.
Bids were received on February 8, 2018, for results refer to the Charlotte Water website.
The Project consists of constructing approximately 1,625 feet of 6-inch water line and 600 feet of 8-inch sanitary sewer, and all appurtenances.
Bids were received on February 1, 2018
Awarded to Lakey’s Backhoe Service, Mocksville, NC – Bid Tab
The Project consists of constructing approximately 2,000 feet of 20-inch force main and all appurtenances.
Bids were received on October 24, 2017
Awarded to Landsdown Earth and Pipe, Inc. – Bid Tab
The Project consists of expanding the existing Muddy Creek Wastewater Treatment Plant to a process capacity of 300,000 gallons per day (gpd).
Bids were received on August 31, 2017
Awarded to: State Utility Contractors, Inc. – Bid Tab
The Project consists of constructing approximately 5,300 feet of 6-inch through 12-inch water lines, 2,000 feet of 8-inch replacement sewer lines, 6 manholes and all appurtenances.
Bids were received on August 8, 2017
Awarded to: Buckeye Bridge, LLC. – Bid Tab
The Project consists of 1,200 feet of 6-inch and 8-inch ductile iron water line in Main Street and Depot Street in downtown Mocksville.
Bids were received on May 2, 2017
Awarded to Lakey’s Backhoe Service, Inc. – Bid Tab
The Project consists of 860 feet of 8-inch sewer, 10 manholes, service connections, television inspections, restorations and all appurtenances.
Bid were received on February 14, 2017 for results contact Union County Procurement Division.